At a former metal plating facility, soil and groundwater was contaminated with production waste including hexavalent chrome and PFAS (PFOS, PFHxS). Cascade was brought in to perform a pilot test to demonstrate the feasibility of full scale remediation of groundwater. The pilot test was conducted in the center of the plume consisting of 10 direct push injection locations in the vicinity of 2 newly installed monitoring wells.
FIND OUT MORE ON THIS ENVIRONMENTAL REMEDIATION PROJECT IN THE PDF BELOW