Treatment of TCE to 30 Meters in Fractured Bedrock

Title:
Treatment of TCE to 30 Meters in Fractured Granite – How to Close a Site When You Cannot Drill and Sample the Rock

Session:
E2: Managing/Remediating Chlorinated Solvent Impacts at Fractured Bedrock Sites

Site Remediation Thermal

 

Since the 1950's this site was used for testing aerospace components. About 15 years ago operations at the site were discontinued and since then, most structures have been demolished. 

The exact source zone and treatment volume was still to be refined, and TCE was present in fractures below the water table. 

This challenging site was well suited for TerraTherm's TCH technology within fractured granite. 