Drilling

When groundwater contamination was discovered on the client's site, a remedy was chosen that required the installation of 20 injection and extraction wells. Cascade crews were brought in to use dual rotary for the drilling and well installation, but encountered multiple challenges--namely, the 120-degree F heat.

Download the project highlight to learn how our crews completed the work safely and on time.