Over time, this site accumulated over 120 drums of soil and water that were staged in a field next to a jogging path. Our client requested that Cascade ensure container closure, labeling, palletizing, and proper shipment of waste for off-site disposal to an approved CERCLA-OSR facility.
Cascade profiled the soil and water drums into a CERCLA-OSR facility, and supplied the labor and forklift to label, palletize, and load the drums onto a 53’ trailer. Material was loaded off-site in its entirety over the course of three separate pick-ups.